Location: Mtubatuba, KwaZulu-Natal, South Africa
Industry: Coal Mining
The Challenge
Finance constraints, site uncertainty, and community resistance delayed the weighbridge installation.
The Solution
Stakeholder mediation and site redesign led to installation of two 24m weighbridges under a full civil and systems contract.
The Outcome
Operational success with community support. Increased coal logistics efficiency.

