Weighbridges

Weighbridges Automation.
Weighbridge Automation

Vehicle Weighing explained: Site entry is controlled by the security office, all vehicles entering the site need to be cleared by security and security loads the vehicles detail on the system.

Proximity cards, and or RFID tagging, is linked to the transaction and the vehicle enters the site, proceed to be weighed at the weighbridge station. The vehicle weighing cycle from entry to exit takes 24 seconds compared to the average of between three to five minutes.

Automated Vehicle Weighing Process

Customer can opt for a label to be printed with vehicle detail while the driver sits in the vehicle, printer used takes 300m rolls paper, 500 trucks a day for a week can be weighed before the roll needs to be replaced.

When the exit weight is recorded the vehicle proceeds to security office, where the driver hands back the proximity card that he received on entry.

Security officer swipes this card to finish the transaction and the delivery invoice is printed. This card can then be re-used, the programming of the card is a closed loop.

Optional: Permanent cards can be allocated to contractors specific vehicles and therefore entering and exiting the site without any delay.

  1. Truck stops on the weighbridge.
  2. Stops on the weighbridge in front of the closed boom and automation tower. The traffic light is red indicating the driver to stop.
  3. The driver scans their proxy card onto the automation tower for the weight to be captured on the system.
  4. The system database checks if all details are valid – truck, driver & cargo are linked.
  5. The automation tower gives the driver a weighbridge ticket with their weight and grants them access to site.
  6. The traffic light turns green and the boom opens to allow the truck through.

Please note:

  • Weighbridges in South Africa cannot exceed 60 Tons, unless a Site-Specific Type Approval is sought.
  • 80 Ton Site-Specific Type Approval(s) can be sought provided that the correct documentation is in place. The lead time for the project is 120 days after date of submission of the project to the regulator.
  • Any additional charges related to Site-Specific Type Approval or General Type Approval (if applicable), will be for the account of the Purchaser.